|
|
|
|
|
|
|
Shemro Engineering was asked to design the bracing system to protect and prepare to transport what some records indicate as the oldest residence in Georgetown, Washington, DC. In order to construct the new Ritz Carlton Georgetown, this structure and two others had to be removed from the site, stored, and then returned to their original locations for extensive historic renovation and incorporation into the overall complex. |